I have about a hundred milestones in my projects, and counting. We have one per Agile release and we've been around a bit.
I don't want to delete the old ones as they have data in them. I don't want to have to scroll down the drop down for 100 plus items every time I assign a defect to a build.
How about sorting those milestones by reverse date order, or reverse numeric (ours are numeric, although they're strings like "1.102" of course). That way, I don't care how long the list is, so long as the latest milestones are at the top of it.
Just a suggestion
I don't want to delete the old ones as they have data in them. I don't want to have to scroll down the drop down for 100 plus items every time I assign a defect to a build.
How about sorting those milestones by reverse date order, or reverse numeric (ours are numeric, although they're strings like "1.102" of course). That way, I don't care how long the list is, so long as the latest milestones are at the top of it.
Just a suggestion